Skip to main content

Field Work

Watch this page for updates on TV Inspection, Flushing, and Construction crews planned work locations. 

TV Inspection:

  • Blackwell and Gibbon roads.
A map showing "Basin 14," with roads, waterways, and surrounding areas, including highways and streets.
Map of Basin 14 where one TV crew will be working.
  • South Medford off of Highway 99
The image is a map showing an area labeled "Basin 11," with various streets and landmarks, including highways and parks.
Map of Basin 11 where the other TV crew will be working

 

Flushing:

  • Dillon Way, Medford, assisting the Construction crew
  • In Jacksonville

Construction:

  • 2nd Avenue, Gold Hill.  Traffic control may be in place.
  • Dillon Way, Medford.