Skip to main content

Sanitary Sewer Standard Drawings

Please call our Engineering Department at (541) 664-6300 to confirm that the drawings below are current versions of the documents. You will need to have Adobe Acrobat Reader or a program capable of reading DWG files installed on your computer in order to view the documents.

Click either link to open the drawing in the format of your choice.

5-1 Service Connection (08/2021) 
5-2 Y or T Connection (9/2007) 
5-3 Mainline Pressure Connection (9/2007) 
5-4 Sewer Service Connection and Abandonment (2/2017) 
5-5 BCI Connection (1/2025) 
5-6 RV Dump (9/2007) 
5-7A Individual RV Dump (9/2007) 
5-8 Backflow Prevention (9/2007) 
5-9 Pressure Connection 9/2007) 
6-1 Standard Manhole and Connection (1/2019) 
6-4 Cleanouts (9/2007) 
6-10 Drop Manhole (9/2007) 
6-15 Large and Deep Manhole (9/2007) 
7-3 Force Main Injection (9/2007) 
7-4 Air Injection Connection (9/2007) 
10-1 E-One Grinder Pump Type Installation (12/2025) 
10-2 Pressure Sewer Terminal Flushing Port (08/2021) 
10-3 Pressure Sewer Flushing Port (08/2021) 
10-4 E-One Grinder Pump Lateral Assembly (02/2022) 
11-2 STEG Tank (9/2007) 
11-3 STEP 2 Compartment Tank (9/2007) 
12-1 Wing Wall (9/2007)